top of page
Large-15W-1.jpg

Project Manager Resources

We update this page frequently to ensure you have access to the most recent versions of our materials. Links are added or updated regularly and will be italicized with "NEW" next to the title for your convenience.

 

Be sure to check back often to stay up-to-date with the latest resources!

Image by NordWood Themes

FORMS

A

Accubid Setup Form

 

B

Back Charge Form

​

Baseline

Budget Meeting Prep Checklist

Budget Meeting Prep Checklist - MEP

PM Plan Presentation Tables - Electrical

PM Plan Presentation Tables - Mechanical

PM Plan Presentation Template - Electrical

PM Plan Presentation Template - MEPS

​

Bill of Sale

Billing for Stored Materials Request Email

Bloodborne Pathogens Policy

Bluebeam Construction Tool Sets

Bluebeam - PDI Profile

Budget Adjustment Details Report (Sample)

Busduct Certification Form

​

C

cBOM Release Report (Sample)

Certificate of Insurance (COI) 2024 - 2025

Check Request Form

Closeout Documents Follow Up Email (Template)

Closeout Documents Letter (Template)

Competent Person Identification Form

Compliance Plans (Sample)

Confined Space Entry Permit

Container Request Form and Guidelines

Contract Review Guide

Coordination Request for Information Letter

Coordination Work Program

Corporate Safety Manual

​​

D

Daily Report Template

               -located in Fieldwire

Delay Claim Form (Template)

Delay of Approved Submittal Email (Template)

Delay of Approved Submittal Letter

Dog House Order Form - Mechanical

Draw Letter Email (Template)

Dropped Object Prevention Plan

Draw Summary Cover Sheet (Sample)

Drug and Alcohol Policy

Duct Drop Order Form - Mechanical

 â€‹

E

Egnyte Folder Structure

Electrical Safety Guide

Emergency Action Plan

Employee Disciplinary Form

Energization Procedure Checklist 

               -located in Fieldwire

Energization Procedure Workflow

Engineering Kick Off Meeting Agenda

Engineering Work Request

Evaluation and Training Request Form

​

F

Fall Rescue Plan & Procedures

Feeder Take-off Verification Form

Field Training Request Form

Fieldwire Issues Report (Sample) 

Final Lien Waiver - Conditional

Final Lien Waiver - Unconditional

Fire Alarm End User Acceptance

Follow Up Re-Submittal Email (Template)

Follow Up Submittal Email (Template)

FRM Scopes & Jobs

FRM Summary Report (Sample)

 

G

Generator Start Up Form

​​

H

Hand and Foot Injury Prevention Policy

Hand and Foot Injury Prevention Policy - Spanish

Heat & Illness Prevention

Hot Work Operations

​

I

​Information to Record in Daily Reports

Initial Walkthrough Checklist

Internal Purchase Order (IPO) Report (Sample)

 

J

Jobsite Checklist

Jobsite Hazard Analysis

Jobsite Safety Inspection Form

             -located in Forms in Fieldwire

Jobsite Safety Inspection Form Instructions

Jobsite Safety Signs - NEW!

Jobsite Theft Protection Best Practices

​​​​

K

KPI Definitions

KPI Updates 2021

​

​​

L

Labor Forecast (Sample)

Labor Look Ahead Tips & Tricks

Labor Tracker Template & Sample

Labor vs. Material KPI Tool

Lien Release Email Template

Lighting Control Kickoff Meeting Agenda - NEW!

Lighting Control Pre-Rough Meeting Agenda - NEW!

Lighting Package Definitions

Lockout/Tagout Activity Logbook

Lockout/Tagout PDI Policy - Bilingual

- located in Forms section of Fieldwire

 â€‹

M

Master Material Purchase Order Agreement

Master Subcontract Agreement 

Material Buyout Process Flowchart

Material Standards

Ductwork

Plumbing

Refrigerant Piping

Material Transfer Request Form

Medium Grade Letter Template

Mobilelock Request Form

 â€‹

N

NECA Manual of Labor Units 2021-2022

New ITR Vendor Request Form

New Project Introduction (Email Template)

New Project Introduction (Org Chart Template)

New Vendor Request Form

Notice of Delay Letter (Email Version)

​​

O

One Line

One Line Diagram (Sample)

Electrical One Line: Setup and Updating

​

OSHA

OSHA 300A 

OSHA Jobsite Visit Checklist

​

Oracle Shortcuts

Organizational Chart (Template)

 

P

Panel Schedule (Template)

PCO Log (Sample)

PDI Acronym Dictionary

PDI Electrical Room Access Log in Sheet

PDI Certificate of Insurance Renewal (COI)

PDI Certificate of Insurance Renewal by Certificate Holder

PDI Letterhead

PDI Sqft Pricing Worksheet

PDI Stored Materials Certificate of Insurance Renewal

PDI Submittal Footer – With Disclaimer

Permit Check Request Form

Performance Review - Field Employee

Performance Review - Foreman

Phenolic Label Request Form

PPE Poster

Print Request Form

Production Docs Set up in FW Checklist

Production Meeting Document Guidelines

Progress Billing Worksheet (Sample)

Project Budget Report (Sample)

Project Folder Structure

Project Hand-off Checklist

Project Plan Meeting Agenda - Electrical

Project Plan Meeting Agenda - MEP

Proposed Change Order (PCO) Checklist

Proposed Change Order (PCO) Email (Template)

Proposed Change Order (PCO) Follow Up Email (Template)

Proposed Change Order (PCO) Form

Purchase Order Requisition (POR) Form

​

Q

Quality Control Evaluation - Distribution (Garden) 

Quality Control Evaluation - Distribution (HR, HD, MR)

Quality Control Evaluation - General

Quality Control Evaluation - Rough

Quality Control Evaluation - Safety

Quality Control Evaluation - Structure

Quality Control Evaluation - Trim

Quality Control Evaluation - Trim (Hotel)

Quality Control Program Overview

 

R

Rectangular Takeoff Form - Mechanical

Rental Equipment Request Form

Request for Notice of Building Dry-In Letter

Request for PDI to Install Moisture Sensitive Material Before       Building Dry-In Email

Request to Store Time Sensitive Material Letter

Re-submittal Presentation Letter (Email Version)

Re-submittal Presentation Letter - NYC Projects Only (Email Version)

Re-submittal Section Coversheets (Template)

Re-submittal Section Coversheets - NYC Projects Only   (Template)

Retainage Reduction Request Email (Template)

Retainage Reduction Request Letter (Template)

Return of Goods Authorization (RGA) Form

​

S

5S Poster

Safety Boots Standards

Safety Pre-Task Plan

             -located in Forms in Fieldwire

Scrap Metal Recycling Locations

SDS Access Instructions

SDS Book

SDS Posters

Service Project Request Form

Silica Exposure Control Plan - English & Spanish

-located in Forms in Fieldwire

Silica Exposure Control Policy

Silica Exposure Control Policy - Spanish

Silica Safety Train the Trainer Guide

Silica Safety Train the Trainer Guide - Spanish

Site Specific Safety Plan

Soft Letter (Template)

SOV Template - ELECTRIAL

SOV Template - ENERGY

SOV Template - MECHANICAL

SOV Template - PLUMBING - CENTRAL PLANT - NEW!

SOV Template - PLUMBING - UNIT WATER HEATERS - NEW!

Spanish Conversation Take Home

Staging Report (Sample)

Standard Wire Sizes

Stored Material Affidavit

Stored Material Invoice

Subcontract General Conditions (Sample)

Subcontractor Certificate of Insurance COI (Sample)

Submittal and Material Procurement Log Template

Submittal MEP Template Links

Submittal Presentation Letter (Email Version)

Submittal Presentation Letter - NYC Projects Only (Email Version)

Submittal Table of Contents & Coversheets (Template)

Submittal Table of Contents & Coversheets - NYC Projects Only   (Template)

Submittal Vendor (Template Sample)

Sunbelt Rentals 2020 Rate Guide​​​​​

SCRIPTS

A

Accubid Change Order Pro

Change Order Pro Guide​

 

Accubid LiveCount Pro

LiveCount Pro Script

​

Autodesk

Creating Issue and Issue Reports in ACC

Data Migration Guide

Navigating, Uploading, and Comparing Sheets in ACC

 

B

Billing

AIA Billing Guide

Billing for Stored Materials

Gathering Documents to Bill for Stored Materials

Generating the AR Aging Report in OBIEE

Monthly Billing Quick Reference Guide

SOV Guidelines Document (Including Mobilization Notes)

Textura Directions for Monthly Billing

Textura Directions for Allocating Change Orders

 

​Bluebeam

Adding Path To Power Chart in Bluebeam

Bluebeam Keyboard Shortcuts

Completing Take-Offs in Bluebeam

Contract Review Tool Kit Download

Contract Review Tool Kit Instructions

 

Best Practices

Best Practices Shortcut "How to Guide" (Android)

Best Practices Shortcut "How to Guide" (Apple)

​

Bid Process Management (BPM)

BPM Script

 

Budget Report

Budget Cheat Sheet

Budgets in the Hub

Making Budget Adjustments

Monthly Budget Update Training Guide

Understanding the Project Budget Report

​

C

cBOM

cBOM in the Hub

Payables in the Hub (AP Holds)

​​​

​​Closeout

Closeout Recap Resource

Project Closeout System

 

​Concur

Booking Travel Through Concur

Creating an Itinerary for Office Employee Travel

​

Contracts

Contract Types Matrix

Design Assist Process

 

​Coordination

Coordination QC Process (QC Apex)​​

​

E

​Egnyte

Cloud Uploads

Remote Users Desktop Sync

Using Egnyte Applications

Web Browser Collaboration Basics 

 

Excel

Excel Reference Card

 

F

Field Resource Management (the Hub)

Labor Tab Script (FRM, Labor Plan, Labor Curve)

​

​Fieldwire

Fieldwire Standards Guide

Uploading Plans

​

Fixtures in The Hub​​

​

I

Insights

Accessing the Production Meeting Documents

Drilling to Detail

​

Internal RFPs

Internal RFP Script

 

​Invoices

Instruction for Clearing Invoice Exceptions

Payables in the Hub Script (AP Holds)

Viewing Invoices Using DocuClass

 

ITR SOV

Creating the ITR SOV Upload

 

J

Jobsite Visit

​

K

Kojo - NEW!​

cBOM in the Hub - Kojo​

Kojo Office Essentials Training Recording

Kojo Script

Mastering Material Release with Kojo

​

L

Labor

Labor Buyout Process and RFP Tool

Labor Buyout Process Flowchart

Labor Tab (FRM, Labor Plan, Labor Curve)

Timecard Approval Process 

 

M

Material Buyout Process Flowchart

Mobilization Notes

​

O

​Openspace

Openspace Reference Guide & Best Practices

Openspace Standard Operating Procedure

Openspace Support Reference Guide

​​​

P

Power Design Resources 

PDR and Ops - Roles and Responsibilities

PDR - RFP Guide for Operations

​

Proposed Change Orders (PCOs)

COM PCO Type Resource

Explaining Material and Labor Pricing

Explaining PCOs Guide

Explaining VDC Guide 

PCO 0 Process and Project Default

PCO Script

Request Review for WD Script

Working with the Change Order Team

 

​Procurement

Procurement Log in The Hub Script

Procurement Log in The Hub Video

​

Purchase Orders (POs) & cBOM

Payables in the Hub Script (AP HOLDS)

​

Production Trackers 

Production Trackers Resource (One Line, Homerun Tracker,   Clear the Path, and WIP Trackers)

 â€‹

Q

QR Code Safety Forms

​

R​

​RFIs

RFI Script

 

S

​Submittals

Creating Submittals in Bluebeam

Submittal Preparation Process

​

SOV Guidelines

SOV Guidelines Document (Including Mobilization Notes)

SOV Guidelines Document- Mechanical 

 â€‹

T

Team Members

Adding, Updating, and Deleting Project Team Members in Oracle

​​

Textura

Allocating Change Orders

Monthly Billing

​

Third Party Contracts

Take Off Tool Script

Third Party Contracts - PO Script

Third Party Subcontracts Resource

 â€‹

V​

VDC Change Orders

​

​VPN

Sophos VPN Client User Guide

​

W

Work in Place Tracker

Work in Place Tracker - Mechanical

T

Taking Ownership Checklist (PM) - Electrical

Taking Ownership Checklist (PM) - MEP

TCO Checklist

Temporary Power Safety Inspection Form

- located in Forms in Fieldwire

Temporary Power Safety Inspection Instructions

Temporary Power Survey

           -located in Forms in Fieldwire

Third-Party Contract Template

Time and Material Form

           -located in Forms in Fieldwire

Tool/Temp Power Transfer Request Form

Torque & Meggar Report

           -located in Forms in Fieldwire

Training Record

Training Sign-in Sheet

Transmittal Letter

Travel and Expense Policy

Two-Way Radio Request

​

U

Unistrut or Angle Hanger Form - Mechanical

Unit Rough Checklist- English

           -located in Forms in Fieldwire

Unit Rough Checklist- Spanish

           -located in Forms in Fieldwire

Unit Trim Checklist- English

           -located in Forms in Fieldwire

Unit Trim Checklist- Spanish

           -located in Forms in Fieldwire

​

V

V5 Manual

VDC Internal Kickoff Meeting Agenda

​

W

Warranty Letter (Email Template)

Warranty Request Form

Warranty Transfer Form

Warranty Work Order Form 

Work in Place (WIP) Tracker (Garden Style)

Work in Place (WIP) Tracker (HR/HD)

Work in Place (WIP) Tracker (Mechanical)

Workday Expense Reports

bottom of page