top of page
Large-DSC02234Jade_ocean_edited.jpg

Electrical Engineering Resources

We update this page frequently to ensure you have access to the most recent versions of our materials. Links are added or updated regularly and will be italicized with "NEW" next to the title for your convenience.

 

Be sure to check back often to stay up-to-date with the latest resources!

Image by NordWood Themes

FORMS & SCRIPTS

A

Action Items Template

As-Built CD Label Template

​

B​

Billing

     AIA Billing Guide

     Management: Cash Engineering Training 

     Monthly Billing Tracker

Budgets in the Hub - Engineering

Budget Adjustments (ICOs) in the Hub​

 

C  

CADD Electronic Data Release Form for PDI

Change Orders and Internal RFPs in the Hub Script

Change Order Management Script​

Close Out Checklist Template

Cover Sheet Template​

 

D

Design Assist Resources

       DA Narrative Template - Electrical

       DA Narrative Tracking Log
​

Design-Build Approach (PDI)​​

 

E

ENG Letter Template

Engineering Exhibits 'A' & 'B'

Engineering Field Certification Template

Engineering Proposal - Design Only Template

 

F

Fax Cover Sheet Template​

 

L

LD Fee Estimate Template​

​Lighting Design Project Setup Needs Checklist

 

M

Master Subcontractor Agreement

Meeting Agenda Template

Meeting Minutes Template (ENG External)

Memo Template​

 

P

PCO Template

Project Proposal Template

Project Proposal Template - LGV Mrk-up​​

 

Q

QC Meeting Sign In Sheet

 

R

Review Response Template ENG

Revision Narrative Template

RFI Response Template ENG​

 

S

Shielded Project QC Checklist

Smartsheet Training

Specifications Templates​

Division 26 - Breakout (Electrical)

DIVISION 26 Table of Contents

260100 Special Requirements

260500 Work Included

260501 Electrical Identification

260515 Testing

260526 Grounding & Bonding

260533 Raceways & Conduits

260534 Boxes

260800 Codes, Fees, and Standards

260801 Elec Commissioning

262000 Electric Service

262200 Dry-type Transformers

262300 Distribution Switchboards

262400 Panelboards & Loadcenters

262500 Overcurrent Protective Devices

262700 Building Wire & Cable

262726 Wiring Devices

262800 Enclosed Switches

262900 Busways

263000 Motor Starters

263001 Control Wiring

263200 Packaged Engine-Generator Set (DIESEL)

263200 Packaged Engine-Generator Set (NATURAL GAS)

263600 Automatic Transfer Switch

265000 Lighting Fixtures

266100 Transient Voltage Surge Suppression

266200 Lightning Protection System

267000 Sustainable Design Requirements

​

Division 27 - Breakout (LV)

DIVISION 27 - LV Specifications - Communications Index 

271116 Communications Cabinets, Racks & Enclosures

270000 Communications

270553 Identification for Comm. Systems

270800 Commissioning of Communications​

271119 Communications Termination Blocks & Patch Panels

271313 Communications Copper Backbone

271323 Communications Optical Fiber Backbone Cabling

271533 Communications Coaxial Horizontal Cabling

​

Division 28 - Fire Alarm Specifications

280000 Networked Fire Alarm System

​

​

T

Table of Contents Template

Transmittal Template ENG​

 

U

Unit Report Template v2

Units Approval Form

Unit Calc Book 

 TOOLS 

A

AL Unit Feeder Schedule and VD Calcs

Available Fault Current & Selective Coordination

​

B

Busway Speculator 1.08 - Voltage Drop

Busway VD Calculator

 

C

CADD Startup Check List

Compliance Data Engineering

​

D

Drawing Index for Electrical

Drawing Index for Fire Alarm Garden Style

Drawing Index for Fire Alarm

 

E

Electrical Service Load Calcs

Engineering Folder Structure

Engineering Project Needs List

​

F

Fault Current Calculation Sheet​

Feeder Schedule 158

Feeder Schedule With MC

Feeder Verification Template

Forecast Pricing 2016

​

G

​Generator Fuel Consumption Calculator

Generator Fuel Usage Chart

 

H

House Emergency Load Summary

House Panel Schedules (224)

​

L

Lighting Fixture Schedule

​

​

M

External Kick Off Meeting Agenda

Internal Kick Off Meeting Agenda​

​

N

NEMA Motor Data Calculator

​​

P

PDI Drawing Check List

​

Process Maps​

0 Project Life Cycle

1 Schematic Design

1-1 Generator Sizing and Type

2 Design Development

2-1 Coordinate with Systems

2-2 Coordination Within Design

2-3 Lay Out Typical Units

2-4 Complete Garage Design and Layout

2-5 Complete QC Process

3 Construction Documents Permit

3-1 Complete Remaining Units

3-2 Progress Generator Calculations

3-3 Submit for Permit

4 Construction Documents IFC

5 Construction Administration

Project Life Cycle (ALL)

 

Q

QC Floor Plans Meeting Agenda

QC ​Riser & Electrical Meeting Agenda

QC ​Units Meeting Agenda

 

R

Riser Feeder Schedule v.11

​

S

SQUARE D Bus Duct - VD Quick-Calc-Bus Duct 

​

T

Temp Service Calculation

Transformer Schedule

 

U

Unit & Bldg Matrix Detail for Load Letter Calcs

Unit Feeder Max Lengths

​

V

Voltage Drop Feeder Schedule

Voltage Drop Standards Training

​

W

Workday Expense Reports​

bottom of page